Privacy settings

Allow Google Analytics to measure visits and tool use so we can improve CADProps. You can change your choice anytime.

Manufacturing guide

CADProps · From a single prototype to a small batch

Low-volume manufacturing

Prepare a small production batch with a controlled revision, first-part checks and an agreed inspection and delivery plan.

  • A drawing-led review before production

Manufacturing is quoted separately. Confirm the material, price and schedule before payment.

Low-volume manufacturing — Illustration — not a customer order or factory photograph.
Illustration — not a customer order or factory photograph.

On this page

What to consider

A repeatable batch starts with a stable drawing and material specification. Separate one-time setup work from recurring part operations when comparing quotes. Order quantity alone does not define cost; finishing, inspection and packing can also influence it.

Design and purchasing details

Specify whether a first part needs approval before the remaining quantity is made. Define measured features, sampling, cosmetic checks and part identification. A split shipment or change after approval needs a fresh schedule and cost review.

Illustrative example

For several related brackets, list quantities by part number and match each drawing to its model. Agree whether all variants must arrive together or whether an approved first batch can ship earlier.

Quote checklist

Keep the drawing revision and units consistent. Include quantity, material, critical dimensions, finish and delivery destination. If a requirement is undecided, explain the intended use.

The agreed quote defines the process, inspection documents, price and delivery schedule. Changes to material or process require your approval.

Common question

Is a repeat order guaranteed to keep the old price?

No. Reference the previous order and current revision; material availability, quantity, finishing and delivery requirements are reconfirmed in the new quote.

Related manufacturing resources

Related process, material and delivery guidance

Prepare your inquiry

Keep the drawing revision and units consistent. Include quantity, material, critical dimensions, finish and delivery destination. If a requirement is undecided, explain the intended use.

Manufacturing is quoted separately. Confirm the material, price and schedule before payment.

Upload drawings for a quote

Files and inquiry details remain private for up to 90 days. We ask before sharing files with a manufacturing supplier.