# Low-volume manufacturing

Prepare a small production batch with a controlled revision, first-part checks and an agreed inspection and delivery plan.

Prepare a small production batch with a controlled revision, first-part checks and an agreed inspection and delivery plan.

## What to consider

A repeatable batch starts with a stable drawing and material specification. Separate one-time setup work from recurring part operations when comparing quotes. Order quantity alone does not define cost; finishing, inspection and packing can also influence it.

## Design and purchasing details

Specify whether a first part needs approval before the remaining quantity is made. Define measured features, sampling, cosmetic checks and part identification. A split shipment or change after approval needs a fresh schedule and cost review.

## Illustrative example

For several related brackets, list quantities by part number and match each drawing to its model. Agree whether all variants must arrive together or whether an approved first batch can ship earlier.

## Quote checklist

Keep the drawing revision and units consistent. Include quantity, material, critical dimensions, finish and delivery destination. If a requirement is undecided, explain the intended use.

The agreed quote defines the process, inspection documents, price and delivery schedule. Changes to material or process require your approval.

## Common question

### Is a repeat order guaranteed to keep the old price?

No. Reference the previous order and current revision; material availability, quantity, finishing and delivery requirements are reconfirmed in the new quote.

HTML page: https://www.cadprops.com/manufacturing/low-volume-manufacturing/
